大人在线免费视频_91久久网_成人免费ssss片_久激情内射婷内射蜜桃_一本久久a久久精品综合_在厨房乱子伦对白

Welcome to Foshan jing ri plastic products co., ltd.
Position
Home > News > Industry news
Research on the construction technology of plastic formwork
2017-11-13 9:33:06
Research on the construction technology of plastic formwork
The core tip: the plastic formwork support system sets the view of large steel templates and the wood templates are easy to support and flexible.
1. Process principle of plastic formwork
The plastic formwork support system has the advantages of large steel formwork and wood formwork, which is easy to support and flexible. The splicing of plastic formwork can be directly fixed to the wooden square by iron nails (see figure l, figure 2). According to the size of concrete members, the size of various models can be combined in the longitudinal and arbitrary direction, and the construction is convenient, and the concrete forming size can be more accurate by using special clamp. Through the use of plastic templates, the concrete appearance quality can be guaranteed, the construction operation is more convenient than steel templates, wood templates, bamboo templates.
Second, low foaming multi-layer plastic building template production process and operation points
The production process and operation points of low-foamed multi-layer plastic building templates belong to the product patent and have been certified by scientific and technological achievements. The process flow of the plastic building formwork is shown in figure 3.
Open mode:
1. Control the time of mold removal. When the concrete is completely set, the concrete will be separated from the template automatically and the process will be faster and easier.
2. The disassembly template must have the demolition order signed by the construction technology department.
3. The demolition of the bottom die shall be carried out in accordance with the requirements of gb5020204-2002 construction quality acceptance of the concrete structure construction. The working class group shall make the application for removal of the application for approval by the technical director of the project department.
4. The work of the formwork shall follow the support of a working class group to perform the operation of the supporting module and the module, and shall follow the principle of the support of the dissection and lateral support of the bracket and the vertical support.
5. Clean the working face after the plastic template is removed, no ash and other garbage, and the surface of the concrete shall not be brushed and removed.
Materials and equipment
Material preparation: low foaming multi-layer plastic building template, channel steel, Angle steel, wood square, nail, bolt, steel bar, sponge bar.

Scan QR codeClose
主站蜘蛛池模板: 天天操夜夜操夜夜操 | 新疆老熟女厉害 | 久久国产劲暴∨内射新川 | 亚洲一二三四视频 | 无码国产成人午夜视频在线播放 | 97久久精品午夜一区二区 | swag破解版 | 蜜桃久久精品成人无码AV | 在线视频爽爽 | 日本国产精品无码字幕在线观看 | 2024你懂的网站无码内射 | 一级特大毛片 | 久久影视一区二区 | 久草在线2 | 伊人久久中文 | 一级做a爰性色毛片免费 | 新tube8xxxxx| 亚洲综合第三页 | 久久亚洲在线 | 免费在线激情视频 | 成人一区二区在线播放 | 黄色一级免费网站 | 特级做a爰片免费看一区 | 亚洲欧美制服亚洲区 | 国产日产欧产精品精品软件 | 在线观看免费自拍亚洲 | 最新黄色av | 高清一区二区三区四区 | 在线观看青青草 | 337p日本欧洲亚洲大胆裸体艺术 | 老师好湿好紧我要进去了在线观看 | 蜜臀色欲AV无码国产精品 | 日韩无限资源 | 天天爽影院一区二区在线影院 | 欧美日本不卡 | 最近免费中文mv在线字幕 | 公和我做好爽添厨房 | 成人午夜福利视频 | 四虎在线永久免费观看 | 国产AV无码专区国产乱码 | 国产一级特黄aaa |